Fujitsu MHZ2250BJ Manuel d'utilisateur Page 122

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 320
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 121
Interface
Unload Feature (Unload Immediate Command):
When the device received the IDLE IMMEDIATE command with the UNLOAD
FEATURE, the head(s) is unloaded to the ramp position. After the device
completed the unload operation, the INTRQ signal will be asserted and the BUSY
flag will be cleared. The time until the head(s) unload to the ramp position is
typically less than 500 milliseconds. This unload operation is not same as the
power management operation. The device just unloads the head(s), and not
executes the power consumption restraint operation. This unload operation effects
the normal (not emergency) load/unload guarantee count per the device life.
Even if the device executes reading look-ahead operation or executes writing
operation, the device unloads the head(s) to the ramp position as soon as possible
when received the IDLE IMMEDIATE command with the Unload Feature. When
the writing operation is stopped, the device keeps the unwritten data. And, the
device keeps the unloaded state until receiving a Soft Reset/ COMRESET, or a
new command except IDLE IMMEDIATE command with the Unload Feature.
At command issuance (Shadow Block Registers setting contents)
CM X 'E1'
DH x x x x xx
CH
CL
SN
SC
FR
X '55'
X '4E'
X '4C'
xx
X '44'
At command completion (Shadow Block Registers contents to be read)
ST Status information
DH x x x x xx
CH
CL
SN
SC
ER
xx
xx
X 'C4'
xx
Error information
5-48 C141-E280
Vue de la page 121
1 2 ... 117 118 119 120 121 122 123 124 125 126 127 ... 319 320

Commentaires sur ces manuels

Pas de commentaire